CWVC Scoping study - Rounds 1 & 2 projects | ||||||
BADC, December 2001 | ||||||
Response from PIs to data survey | ||||||
GST /02/ |
PI | Institutions | Project title | Answer to questionnaire | ||
2314 | Gadian | UMIST | 3-D high resolution meso-scale modeling of droplet growth in cumulus clouds and comparison with observations | Yes
- 15 Aug. - but not very clear. Somehow clarified at FAAM meeting - 26 Oct. |
||
2316 | Choularton Jonas Saunders Illingworth Brown |
UMIST Reading Met Office |
Observations and modelling of the microphysical and radiative properties of mixed phase frontal cloud | No but partial info on C-130 data obtained from Phil Brown - 24 Oct. | ||
2318 | Harries Taylor |
ICL Met Office |
Airborne measurements of the IR radiative properties of ice clouds and clear air using ARIES and TAFTS | No | ||
2321 | Kaye Ulanowski |
Hertfordshire | Single particle experiments to determine the scattering properties of representative regular and irregular ice crystals | Yes - 14 Aug. | ||
2324 | Whiteway Vaughan Choularton Jonas |
Aberystwyth UMIST |
Cirrus, Dynamics and Water Vapour | Yes - 9 Nov. | ||
2867 | Jonas | UMIST | The radiative properties of inhomogeneous cirrus clouds | Yes - 9 Aug. | ||
2871 | Shine Newnham Smith |
Reading RAL |
Near-infrared absorption by water vapour: a co-ordinated laboratory modelling study | Yes - 14 Aug. | ||
2873 | Haigh Goddard De Oliveira |
ICL | Impacts of cloud inhomogeneities on their optical properties | Yes - 3 Sept. | ||
2874 | Choularton Saunders Illingworth Hogan Brown |
UMIST Reading Met Office |
The microphysical and radiative properties of mixed phase clouds | C-130: Phil Brown - 24 Oct. Chilbolton radar: Robin Hogan - 9 Nov. Model: Tom Choularton - 15 Dec. |
||
2879 | Kaye Hirst |
Hertfordshire | Characterising particle size, shape and distribution in ice and mixed-phased clouds | Yes - 26 Sept. | ||
2881 | Whiteway Vaughan Choularton Harries |
Aberystwyth UMIST ICL |
Egrett microphysics experiment with radiation, lidar, and dynamics (EMERALD) | Yes
- 9 Nov. + Clarifications on 11 Dec. |
||
2892 | MacKenzie Haynes |
Lancaster Cambridge |
The origin, evolution and effects of non-convective clouds at the tropical tropopause | Yes - 15 Aug. | ||
Input/output data | ||||||
GST /02/ | PI | End date | Datasets required | Nature of data produced | Volume & longevity of data produced | |
Preliminary data | Validated data | |||||
2314 | Gadian | October 2002 |
§ Met Office
data sets from July 1999 on (no detail) § SCMS data (Wyoming) |
Modelled time
series of cloud microphysical variables (3-D) |
0 | 0 |
2316 | Choularton Jonas Saunders Illingworth Brown |
March 2003 (?) |
None (?) | C-130
data: time series; profiles (of ?) every second; time-averaged particle size spectra. |
C-130: 0 | C-130
data: 5 to 8 flights generating 50-100 Mb = 250-800 Mb in total |
2318 | Harries Taylor |
|||||
2321 | Kaye Ulanowski |
July
2001 (?????) |
None | §
Experimental scattering matrix elements. § Optical + microscope images of crystals |
10
Mb Short-term |
10
Mb Long-term |
2324 | Whiteway Vaughan Choularton Jonas |
March 2002 |
ECMWF analysis | Observation (radar & LiDar backscatter) + model profiles of wind, temperature, humidity, ozone. | 500
Mb Long-term |
? |
2867 | Jonas | June 2003 |
None | Model time series and 3-D fields of ? | 0 | ? |
2871 | Shine Newnham Smith |
September 2002 |
New spectroscopic data sets | Observed + modelled H2O absorption cross sections as a function of wavelength, for different temperatures and pressures. | 10
Gb Long-term (> 20 yrs) |
1
Gb Long-term |
2873 | Haigh Goddard De Oliveira |
December 2002 |
None | No data produced. | NA | NA |
2874 | Choularton Saunders Illingworth Hogan Brown |
November 2003 |
Brown: none (?). Hogan: probably none (has already access to Met Office radiosonde ascents). Choularton: none. |
C-130: See 2316. Radar: 2-D (wavelength + elevation) radar parameters: reflectivities, depolarisation, phase shift, Doppler velocities. Quicklook images. Model: 2-D fields (of?) |
C-130: 0 Radar: 0 Model: 0 |
C-130: See 2316. Radar: 500 Mb/flight x at least 5 flights = minimum of 2500 Mb Model: 100 Mb |
2879 | Kaye Hirst |
November 2003 |
None | Size, shape, spatial distribution of 1-100 microns cloud particles. | NA | NA |
2881 | Whiteway Vaughan Choularton Harries |
June 2003 |
ECMWF analysis | Observation
+ model + images. Time series: wind, T, humidity, O3, particle
concentration. Profiles: the same. IR spectra. Images of cloud particles. |
10
Gb Long-term |
? |
2892 | MacKenzie Haynes |
March 2004 |
§
ECMWF + UKMO analyses from BADC § Data from EMERALD GST/02/2881 |
Model
results: Trajectories. Time series of cloud size distribution and water vapour. |
0 | 20
- 200 Mb Long-term |
Archive details | ||||||
GST /02/ |
PI | Delivery time | Format preference | Other archive | ||
Preliminary data | Validated data | |||||
2314 | Gadian | NA | NA | NA | 2 CDs kept at UMIST | |
2316 | Choularton Jonas Saunders Illingworth Brown |
C-130: NA | C-130: Unknown | C-130: ASCII formatted files on CD-ROM | C-130: Met Office, Y46 Bldg Cody Technological Park Farnborough GU14 0LX |
|
2318 | Harries Taylor |
|||||
2321 | Kaye Ulanowski |
October
2001 -> December 2001 |
... -> July 2002 |
§
ASCII (data) § JPEG (images) |
No | |
2324 | Whiteway Vaughan Choularton Jonas |
? | March
2002 -> April 2002 |
Binary + ASCII | No | |
2867 | Jonas | NA | NA | NA | No | |
2871 | Shine Newnham Smith |
September
2001 -> March 2002 |
December
2001 -> June 2002 |
Preliminary
data: § Bruker OPUS or other portable binary format § Adobe PDF (metadata) Validated data: § HITRAN and/or § ASCII |
Validated
data will also be archived
on § MSF Internet server www.msf.rl.ac.uk/msfdata § HITRAN database www.hitran.com |
|
2873 | Haigh Goddard De Oliveira |
NA | NA | NA | No | |
2874 | Choularton Saunders Illingworth Hogan Brown |
C-130: NA Radar: NA Model: NA |
C-130: Unknown Radar: December 2001 -> 6 months after final flight Model: June 2002 -> June 2003 |
C-130: ASCII Radar: NetCDF (data) + PNG (images) Model: Jif or jpeg |
C-130: Met Office. Radar: No Model:UMIST |
|
2879 | Kaye Hirst |
NA | NA | NA | NA | |
2881 | Whiteway Vaughan Choularton Harries |
January
2002 -> March 2002 |
? | Binary + ASCII | No | |
2892 | MacKenzie Haynes |
NA | May
2002 -> March 2004 |
NASA Ames | No | |
Distribution | ||||||
GST /02/ |
PI | Data to be let at the disposal of other CWVC groups | Restricted access period | Access preferably restricted to | ||
2314 | Gadian | No | NA | NA | ||
2316 | Choularton Jonas Saunders Illingworth Brown |
C-130: Possibly | 2 years | §
CWVC participants § By signed agreement |
||
2318 | Harries Taylor |
|||||
2321 | Kaye Ulanowski |
No | 1 year | Signed agreement. | ||
2324 | Whiteway Vaughan Choularton Jonas |
No | 2 years | *
Participants to same
project * Personally authorised scientists |
||
2867 | Jonas | Unlikely. | No | NA | ||
2871 | Shine Newnham Smith |
Probably no need | 1 year | §
CWVC participants § Personally authorised scientists |
||
2873 | Haigh Goddard De Oliveira |
No | NA | NA | ||
2874 | Choularton Saunders Illingworth Hogan Brown |
C-130: Possibly. Radar: Yes. Model: No. |
C-130: 2 years Radar:None Model: 2 years |
C-130: See 2316 Radar: public Model: CWVC participants |
||
2879 | Kaye Hirst |
No | 2 years | Personally authorised scientists | ||
2881 | Whiteway Vaughan Choularton Harries |
No | 2 years | *
Participants to same project * Personally authorised scientists |
||
2892 | MacKenzie Haynes |
EMERALD (GST/02/2881) | < 2 years | §
CWVC participants § Personally authorised scientists |
||
Requirements expressed and BADC involvement | ||||||
GST /02/ |
PI | PIs’ requirements, comments and suggestions | BADC
involvement + Notes |
|||
2314 | Gadian | §
Output model runs not worth to be archived but ‘others may be interested in
them’ (unclear) § 1 Gbyte=volume of output or input data? (unclear) |
§
No data will be stored at BADC (unclear). Storage of model metadata. § Assistance in obtaining input data? Perhaps. |
|||
2316 | Choularton Jonas Saunders Illingworth Brown |
C-130 data should be kept complete and comprehensive in the long-term. | Some information has been provided by Phil Brown (MRF), who is not one of the PIs and does not know for which project the data will be used. His info covers the data collected aboard the C-130 only. | |||
2318 | Harries Taylor |
No answer provided. | ||||
2321 | Kaye Ulanowski |
None | Archive will be held at BADC. | |||
2324 | Whiteway Vaughan Choularton Jonas |
Raw data not archived at BADC. | Volume of validated data unknown. | |||
2867 | Jonas | Output data will not be worth archiving. | No BADC intervention required but regarding storage of model metadata. | |||
2871 | Shine Newnham Smith |
Highly valuable data. Preserving and documenting both raw and final data for potential future use is essential. | §
Role of BADC essential in ensuring longevity of archive. § Possible contribution in retrieving new spectroscopic data sets as they appear in the future. |
|||
2873 | Haigh Goddard De Oliveira |
None | No BADC intervention required but regarding storage of model metadata. | |||
2874 | Choularton Saunders Illingworth Hogan Brown |
C-130: See 2316. Radar: Quicklook issue: Robin Hogan offers to provide html page to view quicklook PNG files. Model: None. |
Not
clear if Hogan + Brown cover all data to be delivered. C-130 & radar
formats conflict. Choularton: results in form of images? |
|||
2879 | Kaye Hirst |
In the course of this project, data will be collected only to test the developed apparatus, they will have no scientific value. Raw data subsequently produced with the instrument by other groups should be archived. | No BADC intervention required. | |||
2881 | Whiteway Vaughan Choularton Harries |
None | Volume
of validated data unknown. 11/12/2001: 10 Mb in total. |
|||
2892 | MacKenzie Haynes |
None | §
Provision of exchangeable database with GST/02/2881. § Archive of model results. |
|||